VMware VCAP 6.5 ? Data Center Virtualization Design Exam (3V0-624) - VMware now Broadcom Exam Questions
Last updated on June 20, 2026
They have provided the following requirements:
- The existing Fibre Channel (FC) Asymmetrical Active/Active Array and FC switches must
be used.
- No single point of failure to any datastore.
- Configuration must provide failover and load balancing.
- The customer requires a solution that will accommodate virtual machines with three
different I/O load requirements:
Design Requirements: Create a logical design that be applied to each of the ESXi Hosts. The design should meet, but not exceed the customer’s requirements and should include:
- All required hardware
- All required resources
Place the required datastore(s) in the storage array(s). Connect the storage processor(s) to the storage array(s). Connect the switch(es) to the storage processor(s) and HBA(s). Connect the ESXi host to the HBA(s) and Path Selection Policies.


ESXi Host Hardware Objects 2 Port Storage Processor 51/154

Storage Objects 4 Port Storage Processor Path Selection Policies 2 Port HBA Connectors 4 Port HBA iSCSI Switch

Fiber Channel Switch ESXi Host Hardware Objects Storage Objects Path Selection Policies 2 Port HBA Connectors 4 Port HBA iSCSI Switch

ESXi Host Hardware Objects 2 Port Storage Processor Storage Objects 4 Port Storage Processor Path Selection Policies 2 Port HBA Connectors 4 Port HBA iScSi Switch Fiber Channel Switch → 2 Port Storage Processor 4 Port Storage Processor Fiber Channel Switch ESXi Host Hardware Objects 2 Port Storage Processor 52/154 Storage Objects 4 Port Storage Processor

Path Selection Policies 2 Port HBA iSCSI Switch iSCSI Connectors 4 Port HBA Fiber Channel Switch iScSi Switch ESXi Host Hardware Objects Storage Objects → Path Selection Policies 2 Port HBA

Connectors 4 Port HBA Active/Passive Array Hardware Objects Active/Active Array Storage Objects RAID O Datastore Path Selection Policies RAID 5 Datastore Connectors RAID 10 Datastore

WOL Datastore Active/Passive Array Hardware Objects Active/Active Array Storage Objects RAID 0 Datastore → Path Selection Policies RAID 5 Datastore

Connectors RAID 10 Datastore WOL Datastore 2 Port Storage Processor 4 Port Storage Processor FC Fiber Channel Switch Asymmetrical Active/Passive Storage Array → Asymmetrical Active/Passive Storage Array Hardware Objects Storage Objects Path Selection Policies

Connectors Hardware Objects Storage Objects Path Selection Policies Connectors RAIDO Hardware Objects Storage Objects

Path Selection Policies Connectors Active/Passive Array Active/Active Array RAID 0 Datastore RAIDS RAID 5 Datastore RAID 10 Datastore

VOL Datastore Active/Passive Array Active/Active Array RAID 0 Datastore RAID 5 Datastore RAID10 RAID 10 Datastore WOL Datastore Active/Passive Array Active/Active Array RAID 0 Datastore RAID 5 Datastore RAID 10 Datastore WOL Datastore Hardware Objects 54/154 Storage Objects Path Selection Policies

Connectors Hardware Objects Storage Objects Path Selection Policies Connectors WOL Hardware Objects Storage Objects

Path Selection Policies Connectors Hardware Objects Storage Objects Path Selection Policies Connectors

Active/Passive Array Active/Active Array RAID 0 Datastore RAID 5 Datastore RAID 10 Datastore VOL Datastore

Fixed PSP → Most Recently Used PSP → FIXED → Most Recently Used PSP MRU → Most Recently Used PSP RR Round Robin PSP Fixed PSP Round Robin PSP Fixed PSP Round Robin PSP












to join the discussion
No discussions yet. Be the first to ask!
Delete Comment
Are you sure? This action cannot be undone.
to join the discussion
No discussions yet. Be the first to ask!
Delete Comment
Are you sure? This action cannot be undone.
1. The CIO wants to add a secondary site for Disaster Recovery (DR) with A hours RPO.
2. The application developer is concerned about anticipated growth as several new projects
3. The CIO is worried about data leaks and theft.
begin.
4. The CTO would like to buy new servers with better specifications and higher
consolidation ratio. Determine the critical requirements for each of the key stakeholders. Some requirements might have more than one stakeholder.

to join the discussion
No discussions yet. Be the first to ask!
Delete Comment
Are you sure? This action cannot be undone.
• two data centers for high availability
• synchronous replication to meet the zero-minute RPO
• separating management workloads from application workloads
• dedicated 10Gb uplink for each low latency server
• single management point for the entire environment
Which two actions would meet the design requirements? (Choose two.)
to join the discussion
No discussions yet. Be the first to ask!
Delete Comment
Are you sure? This action cannot be undone.
to join the discussion
No discussions yet. Be the first to ask!
Delete Comment
Are you sure? This action cannot be undone.
Finish Practice?
Are you sure you want to finish? This will end your practice session.