Official Bank 0/57

Delta – Architecting Multi-Site HPE Storage Solutions (HPE0-J80) - HP Exam Questions

Last updated on June 20, 2026

97% Exam Compliance
57 Total Questions
1
Question
A customer needs a disaster-tolerant replication solution for its Oracle database. The database consists of only one 500 GB volume. You recommend a Remote Copy solution based on HPE 3PAR StoreServ 8200 systems.

Which statement is correct when using multiple RCIP or Fibre Channel ports for this design?
Options
A All available links are used for replication
B Asynchronous streaming replication mode must be used
C Synchronous replication mode must be used
D All available links of the same type are used for replication
Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

2
Question
You are working with a junior storage administrator to document an existing SAN implementation. You must determine if an HPE 3PAR StoreServ 7000 is cabled correctly. The admin only has the 3parcust credentials.

How can you verify that the array is correctly cabled?
Options
A Use HPE 3PAR StoreServ Management Console (SSMC) with read-only rights.
B Check the Storage Systems section in HPE OneView.
C Execute a Checkhealth through SPOCC.
D Use the HPE SAN Visibility tool.
Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

3
Question
Which object is the unit of failover for HPE 3PAR StoreServ File Persona?
Options
A File Provisioning Group
B Virtual File Server
C File Store
D File Share
Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

4
Question
The demonstration of iSCSI Persistent Ports during an HPE 3PAR StoreServ proof of concept fails. What is a possible cause of failure?
Options
A The connected switch gets a loss_sync of the HPE 3PAR StoreServ port and disconnects the port immediately.
B Port Persistence is not configured correctly, so the partner port could not be activated in a timely manner.
C Zoning is not implemented correctly, and the host could not connect to the partner port.
D The connected switch does not accept an unsolicited ARP and does not update the IP address mappings.
Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

5
Question
You discuss a backup and recovery strategy with the customer. You notice that the customer is not clear about the differences between backup and archive strategy terms.
? -> remove from product data
? -> set recovery time objective
? -> satisfy compliance requirements
? -> augment with deduplication
? -> periodically overwrite deduplicate copies
Match the term to the appropriate strategy. (Select five.)
Select 5
Options
A archive -> augment with deduplication
B backup -> periodically overwrite deduplicate copies
C archive -> remove from product data
D backup -> set recovery time objective
E backup -> remove from product data
G. archive -> set recovery time objective
H. backup -> satisfy compliance requirements
I. backup -> augment with deduplication
J. archive -> periodically overwrite deduplicate copies
F archive -> satisfy compliance requirements
Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

Finish Practice?

Are you sure you want to finish? This will end your practice session.