1
Question
You have completed a non-disruptive activation of firmware on an SN6000 switch.

Which session must be restarted manually?
Options
A Enterprise Fabric Management Suite session
B SAN connection Manager session
C telnet session
D QuickTools session
Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

2
Question
A customer has reported that while running an application that is streaming live data, they experience fluctuations in processor frequency as they increase the server performance.

Which HPE ProLiant Gen10 system tuning feature would help eliminate this issue?
Options
A jitter smoothing
B workload matching
C silicon root of trust
D core boosting
Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

3
Question
A customer wants to safeguard their server firmware and asks you about the HPE ProLiant Gen10 features that provide this level of security.

Which Gen10 feature best addresses the customer’s concern?
Options
A Gen10 servers use silicon root of trust to validate and detect corrupted firmware, and authentication to block unauthorized updates
B Gen10 servers support data encryption at rest, which uses cryptography on the database housing the data and on the physical storage where the databases are stored
C The Secure Boot feature in Gen10 servers checks the signature of the firmware drivers and other files to ensure that the firmware is trusted by the operating system
D The Trusted Platform Module (TPM) in Gen10 servers protects firmware by using public and
private key encryption
Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

4
Question
You are installing a HPE MSA storage system and need to connect the power cooling module (PCM).

What should you do to ensure power redundancy?
Options
A Connect redundant power cords from the PCM controller to independent power supplies
B Verify that each cooling fan is cabled to a separate controller
C Ensure that a physical service processor is properly connected to each PCM
D Connect each PCM within a shelf to a different power distribution unit (PDU)
Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

5
Question
You plan to perform maintenance on several systems in a rack. You need to ensure that the rack does not tip when you are working on the equipment.

What should you use?
Options
A leveling feet
B adjustable depth frame
C stabilizer kit
D lockable casters
Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!