A customer has the following configuration: Frame 1

• Bay 1 – HPE Synergy 12Gb SAS Connection Module

• Bay 2

• Bay 3 – HPE Virtual Connect SE 40 GB F8 Module

• Bay 4 – HPE Synergy 12GB SAS Connection Module

• Bay 5

• Bay 6 – HPE Synergy 10 Gb Interconnect Link Module
Frame 2

• Bay 1 – HPE Synergy 12Gb SAS Connection Module

• Bay 2

• Bay 3 – HPE Synergy 10Gb Interconnect Link Module

• Bay 4 – HPE Synergy 12Gb SAS Connection Module

• Bay 5

• Bay 6 – HPE Virtual Connect SE 40Gb F8 Module

How many more frames can the customer add to their Synergy composable fabric? (Note: Enter your answer in the answer field below.)
Options
A Frame 1 – Bay 2 – HPE Virtual Connect SE 100Gb F32 Module for Synergy (867796-B21) Frame 1 – Bay 5 – HPE Virtual Connect SE 16Gb Fibre Channel Module for Synergy (779227-B21) Frame 2 – Bay 5 – HPE Synergy 4820C 10/20/25Gb Converged Network Adapter (876449- B21)
B Frame 1 – Bay 2 – HPE Virtual Connect SE 100Gb F32 Module for Synergy (867796-B21) Frame 1 – Bay 5 – HPE Virtual Connect SE 16Gb Fibre Channel Module for Synergy (779227-B21) Frame 2 - Bay 2 – Brocade 16Gb/24 Power Pack+ Fibre Channel SAN Switch Module for HPE Synergy (K2Q86A) Frame 2 – Bay 5 – HPE Synergy 4820C 10/20/25Gb Converged Network Adapter (876449- B21)
Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

2
Question
CORRECT TEXT An integrator needs to set up three Synergy Frames. All three frames are equipped with two HPE Synergy Virtual Connect SE 40Gb F8 modules.

How many frames must the integrator select in the Enclosure Group?
Reveal Only
Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

3
Question
HOTSPOT An integrator is creating a server profile template for a VMware Cluster in a Synergy environment. The network administrator has given the server team two 40Gb uplinks with all 200 VLANs presented.

Click the appropriate network type that the integrator should select.
HOTSPOT
Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

4
Question
An integrator has installed a new Synergy frame into a rack with two existing Synergy HOTSPOT frames in a customer’s environment. Click where the integrator should verify that the cabling for the management ring was completed correctly.

Exhibit
Reveal Only
Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

5
Question
A customer has a five-frame Synergy deployment with redundant Composers. An integrator needs to install Image Streamer.

What must the integrator consider before taking the planned action?
Options
A The location of the Image Streamer must be manually modified through the Composer
B A connection to the management network must be established to an FLM in the same frame that houses the Image Streamer
C The frame where the Image Streamer is being installed must not contain an Interconnect Module
D Image Streamer requires the use of the MGMT port from both of the FLMs in the frame
where the Image Streamer appliance is installed
Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

Finish Practice?

Are you sure you want to finish? This will end your practice session.