Building HPE Data Center Solutions (HPE0-S51) - HP Actual Exam Questions

Last updated on April 25, 2026

97% Exam Compliance
108 Total Questions
1
Question

You are installing a combined server and storage solution at a customer location. What must you keep in mind regarding the typical requirements for the location? (Choose two.)

Select 2
Options
A

Room temperature must not exceed 35 °C (95 °F)

B

Rack tie kit should be installed on the rack for proper airflow

C

UPSs should be installed at the top of the rack for top mounted power feed

D

There must be at least a 10 cm (4 in) clearance space at the front and back of the components within the racks

E

Rack doors must be unlocked for easy component removal and maintenance

Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

2
Question

You are installing a rack at customer site. How can you ensure redundant power to the rack?

Options
A

Connect an uninterruptible power supply (UPS) to redundant circuit breakers at the facility power source

B

Use two different power cords to connect the server to the power grid at the customer site

C

Install two power distribution units (PDUs) with each one connected to a power socket supplied by an independent electrical power source

D

Ensure 3-phase power is available in the data center

Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

3
Question

You are installing a HPE ProLiant server in a rack at a customer site. The customer’s facility in a high- voltage utility service area, and they want to be certain that the power supply is supported. Which ProLiant feature addresses the customer’s concern?

Options
A

ProLiant servers can be configured for 380-400V AC in low-line and high-line utility service areas

B

ProLiant servers support 240 V DC power supplies because components on a direct current line are less prone to failure

C

ProLiant servers include auto-sensing power supplies with a power input range of 100-240 VAC, so they can be used globally

D

Rack-mountable HPE servers ship with 110 V DC power supplies because direct current is less expensive for a low-line utility service over short distances

Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

4
Question

You are configuring a FlexFabric switch for a customer environment. The customer has requested specific SFP+ transceivers, power options, and cables. Which HPE tool enables you to select and configure a switch according to precise specifications?

Options
A

Single Point of Connectivity Knowledge (SPOCK)

B

One Config Simple (OCS)

C

Switch Selector

D

Networking Online Configurator

Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

5
Question

A server administrator needs to see the 24-hour history of the power consumed by an installed HPE ProLiant server. Which HPE tool can the admin use to gather this information?

Options
A

IMC

B

Power Advisor

C

iLO

D

UEFI

Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!