Official Bank 0/51

Integrating HPE Synergy Solutions (HPE0-S50) - HP Actual Exam Questions

Last updated on April 25, 2026

97% Exam Compliance
51 Total Questions
1
Question

As part of a synergy implantation synergy integration needs to create 100 networks in a Logical Interconnect Group (LIG) configuration. The network administration for the end-of-row (EoR) switches provides a CSV file with the network that need to be created. How should the Synergy Integrator automate the creation of the 100 networks?

Options
A

Upload the CSV file to the Composer and execute the Create Networks wizard.

B

Use the HPE OneView PowerShell library to create the networks listed in the CVS file.

C

Start HPE SUT to migrate the CSV file to a Synergy configuration file and upload it to the composer.

D

Configure Image stream to automate the network configuration.

Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

2
Question

A customer has a multi-frame Synergy solution. The customer's Support team recently missed some important alerts in its Composer instance because each pair of Composers resides on a separate management network. What should the customer do to minimize the risk of this reoccurring?

Options
A

Configure HPE Intelligent Management Center

B

Implement HPE Synergy Global Dashboard

C

Configure Remote Support

D

Implement HPE System insight Manager

Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

3
Question

Which composer of the HPE Synergy solution provides a customer with the ability to rapidly provision a consistent operation environment?

Options
A

OpenView

B

Reference Architecture

C

Composer

D

Image Streamer

Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

4
Question

A customer has the following requirements for an HPE Synergy solution: * Data for the internal application needs to be stored in the frame. * Compute modules needs to have access to a large database on an external storage array. * The Synergy infrastructure should be managed with HPE OneView

Options
A

Two SAS Connection Modules into 1 and 2: two Synergy 40Gb Fb switch module into bays 3 and 4 two Brocade 16Gb/12 Fiber Channel switches into bays 5 and 6

B

two SAS Connection Modules into bays 1 and 4, two HPE Synergy Connect SE modules into bays 3 and 6

C

two SAS Connection Modules into bays 1 and 2: two HPE Synergy Connect SE 40Gb F8 modules into bays and 4

D

two SAS Connection Modules into bays 1 and 4: 4 two Synergy 40Gb F8 switch modules into 2 and 5: two Brocade 16Gb/12 FC Switches into bays 3 and 6

Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

5
Question

When should IP address be assigned using an IPv6 address pool in the Composer? (Select two.)

Select 2
Options
A

when configuring management NICs in an operating system

B

when booting to an iSCSI initiator with image Streamer

C

when PXE booting from the deployment server

D

when configuration Composer appliance

E

when configuration interconnects modules

Discussion (0 comments)

to join the discussion

Community Discussion

No discussions yet. Be the first to ask!

Finish Practice?

Are you sure you want to finish? This will end your practice session.